Details: loading, unloading, transportation and stacking/ placement of 10” ms pipes s as per the instructions of engineer in charge. ( for transportation of pipe, departmental vehicle will be provided). loading, unloading, transportation and stacking/ placement of 08” ms pipes as per the instructions of engineer in charge. ( for transportation of pipe, departmental vehicle will be provided). laying and jointing of 10” ms pipeline including loading & unloading transportation and placement, cutting and welding of pipes & cutting and fitting of packing. (if jointing by nut-bolt).(gas and welding electrodes and ms nut & bolt will be supplied by contractor. power source (vehicle mounted dg set with diesel ) will be provided by contractor. for transportation of pipe, departmental vehicle will be provided)
Sector: Mining