Description: Dismentling of 51dip belt and Transportation and installation of 800 mm wide belt conveyor along in 74LW from 40dD to 50D and extension of 40DW pony belt conveyor from 71LW to 81LW total 500 00 mtr length in seam 0 Bottom Seam at Rehar UG Min Name of the Work Contract No
Details: Dismentling of 500 mtr. Belt , 100 top rollers, 167bottom rollers, 500 mtrs. Belt structure including 334 channels ( 03 mtrs. each), 334 brackets and 167 stools. Transportation of dismentled structure including 334 chanels (3mtrs. each), 334 brackets, 167 stools, 1000 top rollers, 167 bottom rollers and 500 mtrs. belt upto track line, loading on trolleys and tubs, transporting to point nearest to installation site, unloading and transporting to place of installation(with extension) Fitting of above material at new installation site. Dismantling of Tail end including drum and frame i.e. complete set transporting up to track line, loading on trolleys, transporting to point nearest to installation site, unloading and transporting to place of installation and fitting. Dismantling of discharge end including drum and frame i.e. complete set transporting up to track line, loading on trolleys, transporting to point nearest to installation site, unloading and transporting to place of inst
Sector: Mining