Details: s.l.no. description quantity unit per1earth work in excavation in foundation, trenches, road etc. in all soils mixed with gravels, including dressing thesides, trimming and prepairing the bed for foundation, de-watering, including refilling the excavated stuff aroundthe foundation, watering, consolidating etc. complete as per drawing, specification and instruction of the eic. up30.00 cum2laying plain cement concrete 1:1½:3 (1 cement: 1½ coarse sand (zone-iii) : 3 graded stoneaggregate 20 mm nominal size) for floors, drain, pavement, hard surfacing including loading, unloading,transportation of materials from stock yard to work site. finishing concrete surface, in line, level, curing, de21.00 cum31st class brick work with bricks in foundation and plinth in cement mortar 1:6 (1 cement : 6 sand) to correct, line,level, and plumb including raking out the joints, curing, de-watering, loading, unloading, transporting materialsfrom stock yard to work site etc. all complete as per specificatio
Sector: Research center