Description: Cleaning Testing and Calibration of 1833 nos test weight for annual verification and stamping of road weighbridges Banwar Road weighbridge 1 and Banwar Road weighbridge 2 installed at Topa Project under Kuju Area Name of the Work Contract No
Details: A):-50MT LEO make electronic Road Weighbridge installed at Topa Project (Banwar weighbridge 02) Cleaning Testing and Calibration of weights (20kg each) (50000kg/3=16667/20=833 Nos) B):-60MT Globle make electronic Road weighbridge installed at Topa Project (Banwar weighbridge 01) Cleaning ,Testing and Calibration of CI weights (20kg each) (60000kg/3=20000/20=1000Nos) Total impact of GST for the purpose of CTC
Sector: Mining