Details: dismantling of tower of high mast light (30 mtr.) along with all accessories behindthe 400kv switchyard at ktps phase-ii construction site.2. shifting high mast tower from ktps phase-ii construction site to ktps townshiparea of dvc, koderma.3. of high mast tower at ktps township site.4. commissioning of high mast tower along with all accessories likes steel rope, topdome in the tower.5. painting of high mast tower.6. the entire mast fitting to be slung along with a pull-down rope and an anti-sloperope tied to the sling.7. the mast is to be lifted from battens in accordance with the door positionsteadying with mast hand control rope.8. the mast to be fitted over the foundation bolts to the original location mark.9. while lowering the mast on to the foundation bolts care should be taken, after themast fitted on the foundation bolts, it should immediately be secured with theupper set of nuts. the nuts to be tightened ensuring that the mast is beddingsatisfactorily on the foundation leve
Sector: Power Sector