Details: optical fibre cable (ofc) laying and construction work in dhanbad business area excavation of trench (open / hdd) for plb pipe laying, backfilling, reinstatement and compaction after laying of plb pipe, laying/ blowing of optical fibre cable inside laid plb pipe, splicing and jointing of optical fibre cable including supply of as built diagram (abd) of constructed ofc route and acceptance testing, commissioning and makeover of the routes. the work also includes road / bridge crossing, laying of plb inside dwc pipe wherever required. the cost shall include fixing of joint chamber, manhole, splice closure, fixing, painting and sign writing of route/joint indicators, termination at ftb and all the relevant accessories etc. and end to end testing of dark and lit fibre (for underground laying) (as per the specification).
Sector: Telecommunication