Details: maintenance of earthen shoulder (filling with fresh soil) making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. by mix in place methodconstruction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at omc, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.rate per for grading-v material wet mix macadam (plant mix method)providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired den
Sector: Road development