Description: Improvement to hand railing of stairs by way of replacing the damaged and construction of additional safety railing opposite to Nandi point stretch including painting of railing at Holy Cave Name of Work Improvement to hand railing of stairs by way of replacing the damaged and construction of additional safety railing opposite to Nandi point stretch including painting of railing at HolyCave
Details: Earth work in trench excavation for foundations, drains, pipes, cables including dressing of sides and remning of bottoms, lift upto 1.50 including getting out excavated earth and disposal of excavated earth as directed within 1 m from cutting edge in all kinds of soil. Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) Demolishing C.C. manually means including disposal of material within 50 m lead as per direction of engineer in charge (1:3:6 or richer Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size 15mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 coarse sand) Centering and shuttering including s
Sector: Religious building