Description: Construction of RCC Retaining Wall for Chenab Hostel at IUST Campus I Name of Work Construction of RCC Retaining wall at Chenab Hostel IUST Awantipora
Details: Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : Providing and laying Stone soling hand packed incl ramming, watering etc complete job Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. Supplying and filling Stones/Boulder On Back Side Of R.Wall etc
Sector: Science and Technology