Description: Chain Link Fencing near DTGH and along NH 1 from Head Yard to Power House Entry Gate at Uri II Power Station Name of Work Chain Link Fencing near DTGH and along NH 1 from Head Yard to Power House Entry Gate at Uri II Power Station
Details: Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock : Dismantling steel work in single sections including dismembering and stacking within 50 meters lead in : Channels, angles, tees and flats Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar Random Rubble masonry with hard stone in foundation and plinth including leveling up w
Sector: Generation