Details: supply,testing,loading,transportation,unloading, and of steel tubular pole, 9 mtr. long pole(st-410 sp33) with planting depth of 1/6 th of the height of the pole, (9 mtr. long ) as per approved drawings/standards supply,testing,loading,transportation,unloading, and of steel tubular pole, 8 mtr. long pole(sp15) with planting depth of 1/6 the of the height of the pole, (8 mtr. long ) as per approved drawings/standards supply,testing,loading,transportation,unloading, , laying ,stringing, tensioning & binding of acsr conductor, (30mm2 acsr conductor) as per approved drawings/standards supply,testing,loading,transportation,unloading, , laying ,stringing, tensioning & binding of acsr conductor, (50mm2 acsr conductor) as per approved drawings/standards supply,testing,loading,transportation,unloading and fixing of g.i channel 75x40x6mm, along with suitable clamps & collars as per rec standard supply,
Sector: Power Sector