Details: charging of 63/25 kva sub-stations installed by m/s emc on feeder no. 03 & 04 emanating from receiving station zainakote under capex budget 2024-25 work code pddss2324100142 falling under the jurisdiction of esd zainakote, ed-3rd (turnkey basis) supply, installation, testing and commissioning of s.t. poles 9.0 meter long swaged type conforming to st 410 sp-33, is: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and red-oxide coated above ground level with earthing arrangement through bolt welded on pole, provided at height of 300mm above the planting depth which should be 1.5 mtr (sp 33). top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded. supply, installation, testing and commissioning of s.t. poles 8.0 meter long swaged type conforming to st 410 sp-155, is: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and red-oxide coated above ground level with earthing
Sector: Power Sector