Details: supply, transportation and errection of 8mtr long st poles (410-sp 15) completely erected in the pit of 1/6th of the pole length including excavation and back filling of the pole pit . (as per rec standard) supply,carraige upto site,, laying ,stringing, tensioning , binding of acsr conductor, (50mm2 acsr conductor) as per rec standard. supply and fixing of lt shackle insulators with g.i mukhi clamps (scaffolding g.i lt clamps) including nuts and bolts as per rec standard sitc of galvanised stay set with 50x8mm stay clamp, guy insulator(2nos.), anchor plate (300x 300 x 8 mm), nut-bolts, 2 nos turn-buckles, 1.8m long, 16 mm diameter solid gs stay rod & 7/3.15 mm dia gi stranded wire complete . sitc of line spacers earthing of poles complete by gi pipe 40 mm or gi rod 16 mm 3mtr long through gi 25x3 mm (as per rec standards) cement bottoming of s.t poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” f
Sector: Power Sector