Details: supply , transportation and errection of 9mtr long st poles (410 sp-33) completely errected in the pit of 1/6th of the pole length including excavation and back filling of the pole pit. (as per rec standard) supply, transportation and errection of 8mtr long st poles (410-sp 15) completely erected in the pit of 1/6th of the pole length including excavation and back filling of the pole pit . (as per rec standard) supply,carraige upto site,, laying ,stringing, tensioning , binding of acsr conductor, (30mm2 acsr conductor) as per rec standard. supply, transportation and fixing of gi channel /angle iron for cross arms, braces, transformer belt, f-top, collers etc for sub station and poles (complete job including nuts & bolts and washers) supply and fixing of 11kv polymeric composite pin insulator 12kv, 5kn, lighting impulse 75kv positive and 80kv negative, creepage distance 320mm supply and fixing of lt shackle insulators with g.i mukhi clamps (scaffolding g.i lt clamps) including nuts a
Sector: Power Sector