Details: “replacement/insertion of 9mtr pcc poles in hiranagar area (sub division hiranagar of electric division kathua) on turnkey basis under ut capex budget 2024-25”. (work shall be executed at different locations of sub division hiranagar i.e. bobiya, paharpur, kotpunnu-ii, mukandpur, haria chak, marheen, ghair, sunjwan, kotpunnu-i, chandwan, kattal gujran, dinga amb-i, dinga amb-ii, dayala chak, chadwal, chakra, saida, hiranagar-i, jandi, kootah-i, rajbagh, channi and adjoining areas) 9mtr long pole (pcc wl-300kg) gi v cross-arm/horizontal with top bracket including clamp 11kv polymeric composite pin insulator 12kv, 5kn, lightening impulse 75kv positive and 80kv negative, creepage distance 320mm galvinized nuts and bolts. stone pad (300mm x 300mm x 75mm)
Sector: Power Sector