Details: earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge: all kinds of soil hard rock (blasting prohibited) dismantling old protection work including cutting of crates and stacking of stones. dismantling concrete grouted stone pitching in apron drain etc. including stacking of serviceable material and disposal of unserviceable material, stacking/disposal lead up to 100m. providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:4:8 (1 cement :
Sector: Power Sector