Details: conducting of survey for demarcation of submergence line viz (frl,frl-2,frl-4) by way of fixing of points at 50m interval along the submergence length of 10km on each side of river chenab , using theodolite /electronic total station instrument, including jungle/bush clearance.taking daily progress of 2.0 km laying of submergence blocksearth work in bulk excavation by manual means over areas (exceeding 30 cm in depth1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m as directed by engineer in charge.all kinds of soil quantity for 300 blocks providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded st
Sector: Power Sector