Details: demolishing r.c.c. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of engineer - in- charge brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in foundation upto plinth level cement mortar 1:6 (1 cement : 6 coarse sand) 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) neat cement punning centering and shuttering including strutting, propping etc. and removal of form for all height : suspended floors, roofs, landings, balconies and access platform reinforced cement concrete work in beams, suspended floors, roofs having up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-iii) derived from natural sources : 3 graded ston
Sector: Generation