Details: steel (prime) releasing of all material from railways against rrs or indemnity bond unloading from railway wagon and loading into trucks/trainlers/cart etc. transportation from railway siding to stock yard including weightment. unloading from truck/tralier/cart ect. in the stocy yard after weightment. stacking in the stock yard loading into trucks/trailers/carts at the time of sale including weightment. note: in case the materials are received by road at stockyard, the sub contractor shall be eligible to claim payment only operations mentioned at sr. no. 1.04, 1.05 and 1.06 and which will be not more than 70% of total rail rates as fixed by sail). cutting charges (rates will not be fixed more than the rates given by sail to psiec). billets, bloom/slab/rounds/angles/channels/rail plate and other materials having weight up to 5 mts. per piece all kinds of steel material having weight above 5 mts. bending charges (rates will not be fixed more than the rates given by sail to psiec). bendin
Sector: Industry Development