Details: new construction of road mehlan (nh-52) to maradkhera compaction of earth work & preparation of sub grade including loosening, leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the table 300-2 as per technical clause 305 of mort&h specifications. (in case of link roads earth work to be done by villagers) as per csr item no.24.4 c providing and laying of brick on end edging 6.83 cm wide, 11.11 cm long and 22.86 cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50 metre complete as per punjab pwd specifications. construction of granular sub-base by providing material as per grading-iii (table 400-i of mort&h 5th revision), mixing in a mechanical mix plant at omc, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power rol
Sector: Road development