Details: compaction of earth work & preparation of sub grade including loosening, leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the table 300-2 as per technical clause 305 of mort&h specifications. (in case of link roads earth work to be done by villagers) providing & laying of brick on end edging 6.83cm wide, 11.11cm long and 22.86 cm high half brick deep including excavation, refilling and disposal of surplus earth upto 50mtr. complete as per punjab pwd specifications complete as per csr 24.16 (add difference of bricks rate) construction of granular sub-base by providing material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, complete as per mord technical specification providing, laying &