Details: making 50 mm x 50 mm furrows 45 degree to the center line of the road and at one metre interval in the existing bituminous wearing coarse including sweeping and disposal of excavated material within 1000 metres lead complete as per technical clause 404 of mort&h specifications (full surface area will be measured for payment) dismantling brick work tile, masonry or tile lining credit of brick bats obtainted from dismantling of brick edging credit of old bricks obtainted from dismantling of brick edging water bound macadam grading ii (without screening for low volume roads/undersigned roads) providing, laying, spreading and compacting stone aggregates of grading ii to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of binding materials to fill up the interstic
Sector: Road development