Details: earth work in excavation in foundations trenches etc. in all kinds of soil where pick-jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. cement concrete 1:5:10 with 40 mm gauge stone ballast. using concrete mixing volumetric type first class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth. shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) centering and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc. reinforced cement concrete m-20 mechanically batch mixed using batch type concrete mixer as per is:1791 and vibrated by needle but excluding steel reinforcement centring and shuttering in foundat
Sector: Road development