Details: civil work part (a)dismantling of wall tiles at any floor of the building, laid in cement mortar including scraping of cement plaster and disposal of malba at a suitable place within a distance of 100 mtrs of the complex complete in all respect. dismantling of floor tiles at any floor of the building, laid in cement mortar including dismantling of cement concrete base and disposal of malba at a suitable place within a distance of 100 mtrs of the complex complete in all respect. dismantling h.c.i soil pipes including disposal as desired by the engineer-in-charge.100mm i/d h.c.i. pipe 175mm i/d h.c.i. pipe dismantling h.c.i specials including dismantalling of lead joints including cartage / disposal within 5 km.100mm i/d h.c.i. specials 75mm i/d h.c.i. specials dismantling brick work tile, masonry or tile lining in cement dismantling reinforced cement concrete work removing doors and windows together with the dismantling of walls dismantling asbestos cement celotax or other hard board c
Sector: Medical Education