Details: excavation in all kind of soft/loose/ hard/ dense soils, moorum & moorum mixed with boulders and mud including dressing placing the excavated soil neatly in specified dump area or disposing off the same as directed, including cost of site clearance, all materials, machinery ,labour and dressing etc. complete. providing and fixing 25 mm dia. 2.50 m long cold twisted deformed steel anchor rod with 1.25 m length driven into 38 mm dia. hole drilled in bed rock and remaining length embedded in concrete/ masonry including cost of all materials, machinery, labour, drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod etc. complete. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level: with 20mm nominal size graded stone aggregate - m-10 nominal (mix-1 cement : 3 sand : 6 graded stone aggregate ) providing and laying in position cement concrete of specified grade excluding
Sector: Generation