Details: supply and fixing of breather with silica gel (5 kg.) providing of oil temperature meter along with connection providing of winding temperature meter along with connection filteration of transformer oil supply of cork sheet (gasket) 8 mm supply of cork sheet (gasket) 10 mm supply of brass nuts and washers for bushing supply of oil seals of different size for bushings labour charge for repairing of 03 nos. transformers (transformer oil draining, opening top cover , bushing etc, refitting with new cork sheet and oil seals, and oil refilling and testing including and cp) ( excluding filtration) total impact of gst for the purpose of ctc
Sector: Mining