Details: scope of work and terms and conditionsthe contractor shall be responsible to maintain the 7000 lumens projector1.system with accessories and associated peripherals installed at ad wing, hq cac iaf as per the schedule given at annexure 'ii'.2. the contractor will ensure that repair/ maintenance services are performed by qualified engineers and professionals.3. in order to maintain the desired up time of the system, the contractor will maintain adequate spares such as rj-45 connectors, adaptors, hdmi and utp cables etc. so as to avoid any delay in replacement of the unserviceable active components. replacements should be of equal standard or better.4. the replacement of consumables, which includes various cables, rj-45 connectors etc are not covered in the scope of this contract. however, the contractor will replace these consumables on actual cost basis as per the charges prevailing in the market if the iaf desires so.
Sector: Defense