Details: dismantling of existing plaster including disposal of refuse as directed by engg. i/c. within a distance of 60mtr. earth work in excavation in trenches for foundations pipes cables etc in ordinary soil (loam clay or sand) including lift up to providing and laying cement concrete (1:6:12, 1cement: 6 coarse sand: 12 brick ballast nominal size 40 mm ) in all completion of work. in foundation and floor . class-150 brick work in 1:4 cement and corse sand mortar of 1.25 fineless modulus mortar in foundation and plinth including supply of all materials, labour, tools & plants etc, required for proper completion of work. providing and laying of stone ballast with stone dust including water allowance for proper consolidation with hand ramming including labour t&p etc all complete. providing and laying checkered terrazo tiles 20mm averege thick marbal chips of size up to 6mm .in floorson 25 mm thick bed of morter1:1:1 etc all complete. class-150 brick work supper structure above plinth lebel
Sector: Municipality