Details: earth in cutting or in embankment in ordinary soil, excavation to be done in form of regular pits not exceeding 1/2 m. in depth and work in embankment to be in 20 cm layers including ramming and dressing the surface to required level and slopes and also including 1.5 m. lift and 30 m lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 m distance as directed by the engineer in charge. (sl. no. 253 ) providing , laying ,spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-0100 kn static roller in stages to proper grade and camber, applying and brooming , crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per technical specification clause 405 providing , laying ,spreading and compacting stone aggregates of specific sizes to water bou
Sector: Agri Marketing