Details: immediate fault clearance like replacement of disc insulator, pin insulator, jumper rewinding, earth wire, conductor restringing etc of overhead lines in back shift (i.e. 5.00 pm to 8.00 am next day) at east, west, coal and chp of dudhichua mine site in up and mp both. contractor must ensure availability of at least 02 nos unskilled and 01 no skilled manpower per day for immediate attending the fault in work area. note: 1. the rate quoted shall be inclusive of tools and tackles, as well as contractor's profit, but shall be exclusive of cmpf and cmps.2. for detailed scope of work, please refer page no. 133 of the nit. total impact of gst for the purpose of ctc
Sector: Mining