Details: dismantling of cement concrete or brick or granolithic floors including base concrete and including stacking of materials as directed by engg. i/c. within a distance of 60mtr. earth work in surface excavation by mechanical means (hydraulic excavator)/manual means foundation trenches or drain (not exceeding 1.5m in width or 10sqm on plan), excavated soil and disposal of surplus excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m including dressing and sides and ramming of bottoms, lift upto 1.50m including getting out the all kinds of soil. providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - all work up to the plinth level in 1:4:8 (1 cement : 4 coarse sand (zone-iii) : 8 graded stone aggregate 40 mm nominal size providing, laying and jointing of 300mm dia r.c.c. np-2 hume pipe with all charges complete. brick work with common burnt clay (non modular) bricks of class-150 in foundation and
Sector: Municipality