Details: dismantaling c.c work including stocking of materials as directed by engineer-in-charge with in a distance of 60 mt. (200 feet) etc all complete earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5 m , as per directed by engineer-in-charge:2.1.1 all kind soil earth work in excavation in by mechanical means (hydraulic excavator) trenches for foundation pipe cable etc in o ordinary soil (loan clay or sand)including lift up to 1.5 m. lead up to 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the engineer i/c within a lead of 50m. ch-4.2.8.1 laying of base concrete 1:6:12 with cement c.sand & 40mm brick ballast including mat.lab.t&p,etc all complete. ) providing and laying in cement concrete in 1:6:12 (1 cement: 6 fine sand: 12 graded brick aggregate 40 mm. nominal size) and curing complete,
Sector: Municipality