Details: earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding i/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8") layers, including ramming & dressing the surface to required levels and slopes and also including1.5 metre (5ffs) liíts and 30m. (100") lead. the earth from cutting to be used in making embankment or to be deposited as directed by engineer-in-charee. construction of (gsb)granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401. wbm grading - ii providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller
Sector: Agri Marketing