Details: providing &supply ganny bags including cost of sand stiching of bags and laying in position including removing after completion of work. dewatering charge by centrifugal pump including fuel and labour charges all complete work. cleaning of silt sludge foul condition lift upto 30 mtr distance etc all complete as the direction of engineer in charge. (in foul codition ) extra for every additional lift of 1.50 meter or part thereof in excavation/banking excavated of stacked material.( two additional lift) desposal of refused material/malwa distance up to 8 km etc all complete as the direction of engineer in charge.
Sector: Municipality