Details: dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the engineer-in-charge within a distance of 60 meter (200 feet). s.i 692 (a) excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m. and lead upto 30 m. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in charge upto a distance of 30 m. from the foundation trenches. (where machine can not move ) (a) sand filling in plinth and under floor including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc. labour and t&p etc. required for proper complition of the work. saplings of girth upto 30 cms. measured at a height of 1 m. above ground level and removal of
Sector: Municipality