Details: installation of 3 hp submersible pump set transporation of rig machine and its t&p from one site to other site & back from work site. & dismanting of boring machine including loading-unloading etc, all complete. excavation of earth for water collection chamber with needed water by water tanker or other sources. boring work 300 mm dia with all labour, t&p, etc all complete.a) 0 to 30 m gl b) 31 to 65 m bgl c) 66 to 95 m bgl development & working of bore by 100 psi compressor machine including material, labour, t&p, etc, all complete supply & filling of pea gravel of lal kalwan quarry- daily screened size:- 6 to 4.8 mm washed & proper stacking at site.v=[3.14×0.20×0.20×95]-[3.14×0.13×95] =[11.93-5.04]m3=6.89m3 supply of 125 mm dia pvc pipe 28 kg with transporation, loading-unloading all labour, material, etc, all complete. supply of 125 mm dia pvc slotted pipe 28 kg with transporation, loading-unloading all labour, material, etc, all complete. supply of 63 mm dia hdpe pipe supply of
Sector: Municipality