Details: name of work: repairing of damaged stairs along with replacement of tiles of stairs from turbine floor to turbine housing of all three unit at hops obra dismantling of damaged tiles/floor of stair(as per scope of work). providing and laying of 16 mm thick baroda green stone for stairs of machine.(as per scope of work) providing and laying of 8 mm thick vitrified tiles at side walls of stairs of machine. making of hand rail support at both side walls
Sector: Power Sector