Details: earth work exavation in foundation as in wet and foul position lead lift &30 m lead with aqll complete work (s.i.no.251) earth work cutting/filling of embankment lead 30 m and up to 1.5 m lift with all complete work (s.i.no.253) pcc 1:6:12 cement sand and 40mm brick ballast and all compelte the work (s.i.no.-273) construction of granular sub base (g.s.b) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per mort& h specification401 1st class brick work (1:4) cement sand mortor including all complete work (s.i.no.303) struck pointing (1:2) cement sand mortor including all complete work (s.i.no.574) flush pointing (1:2) cement sand mortor including all complete the work (s.i.no.575) cement concrete with cement, sand & 20mm gauge stone grit with the proportion of (1:2:4) including all complete the work. providing &laying of rubber molded reflective zig-zag 80 mm thick interlocking tiles of precast compressive stre
Sector: Municipality