Details: dismentling of existin damaged brick nali and including stacking of materials with all complete work earth work exavation in foundation as in wet and foul position lead lift &30 m lead with aqll complete work (s.i.no.251) pcc 1:6:12 cement sand and 40mm brick ballast and all compelte the work (s.i.no.-273) earth work cutting in ordinary soil up to 1.5 m lift &30m led with all complete work (s.i.no.253) construction of granular sub base (g.s.b) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per mort& h specification401 1st class brick work (1:3) cement sand mortor including all complete work (s.i.no.303) struck pointing (1:2) cement sand mortor including all complete work (s.i.no.574) flush pointing (1:2) cement sand mortor including all complete the work (s.i.no.575) providing &laying of rubber molded reflective zig-zag 80 mm thick interlocking tiles of precast compressive strength i.s.i marked. in gray base
Sector: Municipality