Details: excavation in foundation for structure as per dwaring in ordinarysoil (loam clay or sand) including lift up to 1.5 mtr. & lead upto 30 mtr. & including filling, watering and ramming of excavated earth into the trenches or in to space between the building and the sidding of foundation trenches or in to plinth and removale and disposal of surplus earth as directed by the engineer in charge of 30 mtr. from the foundation trenches. earth work in filling in ordinary soil. granular sub base with coarse graded material providing and laying cement concrete 1:5:10 (1 cement :5 c/sand : 10stone graded agg. 40mm nominal )and curing complete earth filling in plinth including supplly of necessary quantity of each. including watering, ramming and dressing etc. rate to including cost of earth (from a distane of 5 km) labour and t&p etc.required for proper completion of work (as per analysis)(s.i. no. 231a) m 150 brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supp
Sector: Export promotion