Details: excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 mt. and lead upto 30 mt. and including filling watering and ramming of excavated earth into the trenches or into the space between the byilding and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30 m from the foundation trenches- concrete with 4 cms guage stone ballast,coarse sand. and cement in proportion of8:4:1 in foundation and under floors,including supply of all materials, labour,tools & plants etc. required for propercompletion of work. concrete with 2.0 cms guage stone ballast,coarse sand. and cement in proportion of4:2:1 in foundation and under floors,including supply of all materials, labour,tools & plants etc. required for propercompletion of work. providing and fixing g.l. chain link fabricfencing of required width in mesh size50x50 mm including strengthening with 2mm dia wire or nuts, b
Sector: Export promotion