Details: construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 as per si.no.-18, ch. no.-20 providing, laying and spreading material on prepared sub grade, adding cement 43 grade opc @2% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at omc to achieve the desired unconfined compressive strength and to form a layer of sub-base. granular sub-base with coarse graded material (cement treated subbase) providing, laying and spreading material on prepared sub grade, adding cement @4% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at omc to achieve the desired unconfined compressive strength and to form a layer of sub-base/base cement treeted base. providing and applying t
Sector: PWD