Details: excavtion in foundation in ordinary soil including lift up to 1.50 m and lead up to 30 meter excavation earth in to the space between th building and the side of roudnation p/l of cement concreet in 1:4:8 including all supply and matriales m-150 class brick work in 1:4 in foundation up to plinth 5cm thick c.c thick cement concrete with all complete work w.b.m. grading-3providing, laying, spreading and compacting stone aggregated of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading-3 as per technical specification clauses 405. providing and laying of rubber moulded reflective zig-zag 80mm thick tiles of precast compressed c.c passing minimum 30mpa compressive strength isi marked concrete block pavements havi
Sector: Agri Marketing