Details: dismentling of damage cc including stacking dismental material with in 60m distence etc all comp. supply/fixing and jointing rcc hume pipe 250mm dia etc all comp. e/w in surface excavation no exceeding 30 cm in depth but ecceeding 1.5 m width as well as 10 sqm on plan including getting out and disposal of excavated earth up to 50m and lift up to 1.5 m as directed by the engineer in charge; etc all comp. construction of a chamber .60x.60x.9 etc all comp. making concation construction of granular sub base (g.s.b) etc all comp. providing and laying in cement conc concrete 1:1.5:3 (1 cement1.5c sand and 3 graded stone ballast 20 mm nominal size)and curing comp etc all comp. cartage of earth and dismental material upto 3.00km including loading unloading etc all comp. construction of gully pit as per knn design .60x.60x.75 etc all comp. 18 gst
Sector: Municipality