Details: excavation in foundation in ordinry soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 m all completion of the work (sl no.251) concrete with the 4.00 cm gauge brick ballast fine sand of 1.25 finess modulus and cement in the proporation 12:6:1 in foundation and under floor including supply and material all completion of the work (si no.273) m- 150 brick work in 1:4 cement and approved coarse sand mortar in foundation and plinth including supply of all materials, labour and t&p etc. required for the proper completion of the work. (si. no. 307a) earth filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc. rate to include cost of all material labour t&p etc. required for proper completion of work. (rate of analysis) 12 mm thick plaster with cement and and approved coarse sand in 1:4 over brick work minimum thickness not be less than 10m all completion of the w
Sector: Agri Marketing