Details: dismestling of damage ce including stacking disroental material with in 60m distence etc all complete. e/w in surface excavation no exceeding 30 cm in depth but ecceoding 1.5 m width as well as 10 sqm on plan inchuading getting out and disposal of excavated carth up to 50m and lift up to 1.5 m as directed by the engineer in charge, etc all comp construction of gab etc all comp m-150 b/w with 14 cement & csand mortar etc all comp super structur providing and laying in cement cone concrete 1:1.5:3 (1 cement1.se sand and 3 graded stone ballast 20 mm nominal sire)and curing comp ce all comp rising and leveling mainhole etc all comp. cartage of earth and dismental material upto 3.00kas inchading 15 mm thick cement plaster in single cout on fair side of single of half brick wall with 1:4cement finish with a floating cont of neet coment etc all comp supply and fixing manhole rec coller etc all comp supply and fixing manhole cover including all labor material t&p etc all comp. 18 gst
Sector: Municipality