Details: demolishing r.c.c. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of engineer - in- charge. as per dsr s.i. no 15.3 dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 metres lead. as per dsr s.i. no. 15.56 earth work in excavation by mechanical means (hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by engineer-in-charge. as per dsr s.i. no. 2.6.1 providing and laying pf 1:4:8 (1 cement : 4 coarse sand(zone-iii) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). as per dsr s.i. no. 4.1.8 brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in
Sector: PWD