Details: site visit & photograph. raising of chamber excavation in cutting in soil by manual means with lead upto 50 m, excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 (analysis as per integrated sor) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttring 1:5:10 (1 cement : 5 coarse sand ( zone-iii ) derived from natural sources : 10 graded stone aggregate 40mm nominal size derived from natural sources) all work upto plinth level(analysis as per integrated sor) brick masonry work in 1:4 cement mortar (1: cement 4:coarse sand) with common burnt clay non modular briks in foundation complete excluding pointing and plastering as per drawing and technical specifications clauses 600, 1202 & 1203. (analysis as per integrated sor) rcc work grade m-25 i/c all material, labour t&p etc. req. for proper completion
Sector: Export promotion