Details: earth work in excavation in foundation laying of stone dust in foumdation including cost of material , labour, t&p complete laying of pcc in 1:4:8 cement c sand and 40mm stone ballast including cost of material labour t&p etc m-150 brickwork in 1:4 cement and fine sand mortor including cost of material , labour, t&p complete laying of pcc in 1:6:12 cement c sand and 40mm stone ballast including cost of material labour t&p etc providing & laying of polythene sheet 125 micron thick before laying the c.c.road for making separation with base coat concrete and prevention of pumping i/e supply of all material labour t&p. p.c.c. with 20mm. stone grit with approved coarse sand and cement in the porportion of 1:1.5:3 i/e supply of all material labour t&p etc. required for propar complation of work making expansion /construction joint and transverse or longitudinal contraction joint in interval of 3 mtr each in c.c.road slab by full depth form at header joint and one third depth saw cut
Sector: Export promotion