Details: desilting of covered nala in liquid or mud in foul position including lift up to 1.5m etc all complete. disposal of moorum/building / malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading. transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of engineer-in-charge. add 18 % g.s.t.
Sector: Municipality